Frequently Asked Questions
Answers about the AIPLANT4.0 modules and how they work together. Each answer links to the page it came from.
Cost, Compatibility & Security
Indicative pricing for OEE Solution.(excluding GST):
• SaaS: from ₹1500 per machine per month for OEE 4.0. Any additional module price/machine/month to be included based upon the features selection. Remote support are included.
• On-premise: one-time licence from ₹25,000 to ₹40,000 per machine for OEE 4.0.
• Machine connectivity edge hardware and OT around ₹50,000 per machine or One EDGE common EDGE server.
• Network & HW based on your site requirement.
• Implementation Price: 15K to 50K based on site requirements
• CNC/PLC side programming: Depends on the controls needed on your requirements.
• Travel and Accommodation
• Warranty: 1 year Remote support
Per-machine price reduces as machine count increases.
Example: a 25-machine CNC shop starting with OEE 4.0 on SaaS invests roughly ₹14–16 lakh in Year 1.
Share your machine list and we will send a firm quote within 3 working days.
Note : The Above cost are tentative. Actual may vary based on the requirements and Customization.
• Any sensors (energy, vibration, flow, as required)
• Legacy data migration - On your request we can do at additional pricing
• Shop-floor displays, KIOSK and tablets, etc - Can be provided at additional pricing
Third-party licences: on-premise AiPlant4.0 runs on Windows Server and Microsoft SQL Server. If you already have licences, we use them; if not, we supply them at actual cost.
We can deliver the whole project turnkey — server sizing, hardware procurement, networking, gateways, installation and support — with a single point of responsibility.
• CNC controllers (direct data acquisition): Fanuc, Siemens and Mitsubishi controllers, including Fanuc 0i/30i/31i series, Siemens 828D/840D sl and Mitsubishi M70/M80 series.
• Industrial protocols: OPC UA, MT Connect, Focas, Modbus RTU/TCP and MQTT.
• Other equipment: PLC-based machines, special-purpose machines, presses, robots, washing and leak-test machines, and SCADA systems.
• Older / Conventional machines. We have our expertise team to engage to Retrofit / Upgrade the controllers as per your requirements and then we can take the data and connect to the AiPlant4.0. We can discuss during project planning.
• Older CNC machines: We have expertise to take data from old CNC machines also. We can do the assessment and give you an appropriate solution to capture the real-time data.
Kindly send us your machine list (make, model, controller, year) and we will return a machine-by-machine compatibility report within 5 working days.
If customer is expecting to interlocking the CNC machines with AiPlant4.0, We will take the approval from the customer and proceed.
Every change in the program will be properly documented and handed over to the concerned department HOD
Reading data does not normally affect OEM warranty. For machines still under warranty, we recommend confirming with your machine builder; we can join that discussion.
• 5 -10 machines, one module: 1 - 2 weeks
• 25–50 machines, 2–3 modules: 6 – 8 weeks
• 100+ machines, multiple modules: 4 months
What decides the timeline:
• Hardware lead time
• Network readiness on the shop floor
• How quickly master data is shared — parts, ideal cycle times, shifts, downtime reasons
• Availability of customer's stakeholders for training
We share a week-by-week project plan with the purchase order, with named owners on both sides.
Above timeline is an indication.Actual Time period will depend on the Hardware procurement lead time.
• On-premise: installed on a server inside your plant. Data never leaves your network, and the system can run fully air-gapped with no internet connection. This is how AiPlant4.0 runs in defence manufacturing units.
• Phygitalz Cloud : Phygitalz hosts and manages the platform; needs internet access. Server setup is agreed with you during project planning.
• Customer's Cloud : If customer is having their own, we can host AiPlant4.0 platform in customer's cloud environment.
• Access control: role-based authentication and granular permissions for every user and session.
• Deployment option: fully on-premise and air-gapped, so plant data never leaves your network.
• Certification: We will complete your IT security questionnaire and support your IT team's own review before purchase.
Worked example — 25 CNC machines with OEE Solutions, two 8-hour shifts, 26 working days a month:
• Planned production time: 416 hours per machine per month
• OEE improves from 55% to 65% → about 1,040 extra productive hours per month across the shop
• At ₹800 per machine-hour, that is about ₹8.3 lakh of capacity per month
• We count only half of it as realisable (because you need orders to fill it): about ₹4.2 lakh per month
• Year-1 investment of about ₹15 lakh → payback in under 4 months
Note : Actual values may vary. Above are the rough calculation for understanding purpose
Risk, Exit & Support
• AiPlant4.0 has been running in production Indian defence manufacturing units (141 machines), TVS, Japanese OEM, and German automotive OEM, and Indian Tier-1 and Tier-2 machine shops.
• On-premise customers own their installation. The system keeps running on your server, independent of Phygitalz.
• References: we arrange calls with existing customers and visits to running plants in Tamil Nadu.
• Export: reports and raw data can be exported to Excel/CSV at any time. API access is available for integration with your own systems.
• On-premise: the database sits on your server and stays with you.
• SaaS exit: if you end the subscription, we provide a full data export within 15 days and delete your data from our systems within 30 days, with written confirmation.
Phygitalz offers 2 week free trial for your evaluation. Based on the evaluation we can move forward.
We can also do a Pilot lot for 5 machines at agreed price.
• Scope: 5 - 10 machines with OEE 4.0
• Duration: 1 - 2 weeks, including installation
• Agreed success measures before we start — for example, OEE baseline established, more than 90% of downtime captured with a reason, and daily reports used in production meetings
• Software upgrades and bug fixes
• Remote support from 9 am to 6 pm available and 24x7 available at additional price based on your requirement.
• Hardware, network and server troubleshooting for Phygitalz-supplied equipment
• Two preventive health-check visits per year
Response times:
• Critical (system or data collection down): remote response within 4 business hours; on-site within 24 hours in Chennai, 48 hours elsewhere in Tamil Nadu, 72 hours in the rest of India
• Non-critical issues: within 2 working days
Support hours: Monday–Saturday, 9:30 am–6pm IST, with on-call support for critical issues.
Outside India: remote support, with on-site support through local partners.
Operations & Integration
• Production orders and schedules flow in from your ERP.
• Completed production posts back automatically, so your ERP remains the system of record with no manual re-entry.
• Integration methods: API, database views or scheduled file exchange — whichever your ERP and IT team prefer.
Scope for ERP integration will done during the assessment and give you a quote.
Also we have our own ERP already integrated with AiPlant4.0 and you can run the plant in realtime flawlessly
We do have architecture to have edge gateway for each machine so that even when network fails, your data from machine is always in backup at machine level, once network connection is restored, data is pushed to edge server or your on premise server.
We set up daily database backups and a documented restore procedure as part of commissioning.
• Availability = Up time ÷ planned production time. Breaks, planned maintenance and no-plan time are excluded, as configured by you.
• Performance = Parts Produced ÷ Expected parts as per the design Cycle time ( Machine cycle time + Loading & Unloading time.
• Quality =Accepted parts ÷ Total parts Produced.
How to trust OEE calculated? : We don't read the part count from CNC controller, which can be edited by operators; Phygitalz OT software automatically captures, cycle start, end, alarm triggers, dry run, short cycles, dummy cycles and exclude them from OEE calculations.
Paid customisation:
• New reports or screens beyond the standard set
• New system integrations
• Customer-specific workflows
• Legacy data migration
AiPlant4.0 connects all the machines with different controllers in one platform and pull the data from the machine and links to OEE, Maintenance, Quality, Tool life, Spares, Energy and Traceability.
2. Site visit to assess network requirements
3. Decision on On premise or Cloud deployment requirement
4. Master data: parts, ideal cycle times, shifts, downtime and rejection reasons
5. One named project champion from production or maintenance
• OPEX (SaaS): subscription billed annually in advance, or quarterly for larger deployments.
All invoices are GST-compliant, issued by Phygitalz Advisory & Solutions Pvt. Ltd., Chennai.
We have following AI Agents enabled.
• Conversational plant analyst - Based on voice or Text input - Our Agentic AI will pull the exact data of a machine/Cell/Unit/Plant level OEE/Downtime/Production performance will be displayed in few seconds.
• Downtime triage agent
• AI-based component number reading for traceability — each part's serial number is read automatically and linked to its quality measurements
• AI-based special-cause variation detection in SPC (Quality 4.0) using 8 rules
• Abnormal-condition alerts and spare-part demand prediction (PredictM 4.0)
• Auto Ballooning — extracts critical-to-quality characteristics from 2D PDF drawings into Excel
• AI Based Invoice/ PO scanners
• Tool change readiness agent
• Idle energy agent